Tag Archives: infrastructure

Networks and Context

utrechtfeb2017

Our fuchsia trail traces out part of the cycle network in the city/province of Utrecht. It’s only a small part. Even if it hadn’t snowed the first two days of our trip it would still be a small part.

Zoom in and the red lines indicating cycle infrastructure become apparent, as does the rail network, the waterways, and the complexity of the motorway junctions. When I’m in the Netherlands I rarely come into contact with the major road network, and when I do I’m almost always surprised by how comparatively quiet it is when riding next to or looking down on a section of it. My experience as a user is confined to the rail and cycle networks which are often busy, and where the two networks meet in Utrecht is the busiest bike path in the country: “The three busiest cycle paths in the Netherlands are in Utrecht according to the Cyclists’ Union. Smakkelaarsveld tops the list.”

Far less busy is the new bridge just to the south of the station. It’s nice and wide but is essentially a footbridge with a smallish roll-in-roll-out lift at either end. Accessible, but time will tell as to to its ranking on the Fietserbond list.

We stayed in the centre where most people seem to use a bike to get around. There are parked cars wherever space exists for them, but the space is limited so it’s just not possible for everyone who could drive to have a car parked where they live. We saw quite a few car club/share vehicles in the area, paid for with the public transport OV chipcard. Yet despite that I was surprised to see a piece in the local free paper asking: “Is more space for cycling an improvement?”

Riding out of the centre we experienced a variety of infrastructure. I was using the Knooppunt system for navigating – jotting down a series of numbers and following the signs, so we were always on an officially sanctioned cycle route, but places like De Bilt and Zeist felt way below par in terms of separation from traffic. I didn’t get to see much of Zeist, so perhaps that’s an unfair judgment. Or perhaps Zeist really is more car dominated because it has no rail link and a lack of local employment? It certainly felt more car dominated, but I think that was largely down to the design and my subsequent reaction to it.

In contrast, the ride out to Houten was a joy. There have been some improvements since we were last there in 2011, notably the buildings around the southern station Castellum are complete now and a level crossing has been replaced with an underpass on the way to Utrecht. Planned around a train line running through the centre with two stations, the way the cycle network and the car network have been largely separated, and the care taken where they interact, means this is the most stress free urban cycling experience there is. And unlike Milton Keynes, navigation is a breeze.

We didn’t get to experience much of the new Leidsche Rijn development to the West, be interesting to see how that compares with Houten. Something for next time.

One last thing from the local paper. A picture showing how much space those motorway junctions take up, and incredibly, there’s a plan to widen that part of the A27. It seems the motorway network has reached capacity around Utrecht, and the transport department has decided more space for driving will be an improvement.

Crossing Cycle Tracks

I used to despise blister paving. Sounds extreme now, but when it began to appear, seemingly out of nowhere, that response felt fully justified. At the time any lumps and bumps could be problematic, but when someone went out of their way to design what was for me a hazard and place it my path without any consideration for how it would affect me, it elevated tactile paving into a more significant issue than all the existing crap I had to deal with.

It was a long time in coming – almost thirty years – but a solution eventually arrived that eliminated most of the problems I encountered with tactile paving and all the other flat-on-my-face hazards to do with surface variation and slopes. That was in 2009 and it came in the form of a new type of knee for my prosthesis1 which, other limitations notwithstanding, gave me the ability and the confidence to go pretty much anywhere in an urban environment because I could trust it not to collapse.

What’s that got to do with crossing cycle tracks? Aside from the link between blister paving and crossing points, it’s an experience I can draw on to understand how someone might react when their environment is adversely altered having not been consulted. One such example being the RNIB’s response to TfL’s proposed changes outside its offices in Judd Street.

Cycling advocates will be familiar with trying to draw what they consider to be a safe cycle network onto a map of their local area. The parts that qualify are often so few and far between that any network is almost nonexistent, or so fractured there are only one or two complete routes and those require a lot of local knowledge to find and follow. I imagine there must be people carrying out the same exercise to assess and map walking networks for blind people, with similar outcomes, but with an added investment in time and effort to memorise the routes with far fewer cues as to location. Disrupting a popular, safe cycle route is going to trigger an emotive response, so no surprise that threatening to disrupt an important link in the mobility network of blind people elicits the same.

Yet the RNIB’s response did surprise cycling advocates. Despite subjective safety being a well understood concept in cycling circles, statistical arguments about the reduction in motor vehicle movements were being used to counter the objections, and the significance of replacing a pelican crossing with a zebra crossing was completely missed. The conclusion I draw from that is transport planners and cycling advocates are not attuned to, or are misunderstanding, what blind people perceive to be a safe environment.

For a typical pedestrian, crossing a ‘filtered’ Judd Street is likely to be a trivial task; making use of the pelican crossing without waiting to activate it or probably not using it at all and following a desire line. For a blind pedestrian in a street with a lot of cycle traffic the need for a safe crossing point with a safe crossing time isn’t going to disappear with the motor traffic, and listening to the comments of blind people a significant proportion of them do not consider zebra crossings to be sufficiently safe. In 2014 Guide Dogs commissioned a report Road and street crossings for blind and partially sighted people which is subtitled The importance of being certain – and that’s the key point, the lack of certainty in when it’s safe to step off the pavement means zebra crossings are not considered a subjectively safe solution by blind people.

That doesn’t only hold for a filtered Judd Street, it will also apply to a bus stop bypass. I hear through the grapevine that a working group of stakeholders have found that evidence gathered to date from monitoring bus stop bypasses shows that they are not inherently dangerous. That’s good news, however, if blind people are avoiding these bus stops because they don’t consider them to be safe, they are effectively excluded from the evidence base being considered. It’s essentially the same argument cycling advocates use to explain the lack of underrepresented groups cycling in a hostile environment – a lack of subjective safety leads to self exclusion and no amount of stats proving how safe it is for the people who do cycle, or training in how they do it, significantly alters that.

What would make crossing a cycle track subjectively safe for a blind person? The obvious answer is the thing blind people keep asking for, a signal controlled crossing, but currently I would guess there isn’t a design that suits the smaller scale of a bus stop bypass. So what might a small-scale signal controlled crossing look like?

buzzingbusstopbypassdiagram

The image above is a view of an informal crossing at a bus stop bypass on Blackfriars Road. The camera is looking towards St George’s Circus, the asphalt cycle track running between the pavement and the bus stop is about 3m wide and rises to pavement level at the buff coloured, perpendicular informal crossing, which is also about 3m wide. It’s not a busy bus stop and I’ve chosen it simply because it suits my purpose and the photo was easy to lift from Twitter – thanks @Phil_PJA!

I’ve superimposed a partial cross-section onto the photograph showing the components embedded within the street surface that might make up this imagined controlled crossing – there are no poles. Most people would continue to use it as an informal crossing, but blind people in particular could activate it to stop cycle traffic and find out when it’s safe to cross. Here’s how the crossing might operate with reference to the standard components that are being replaced or altered:

  • The button: a person activates the controlled crossing by standing on the pressure sensitive blister paving panel. The panel vibrates to acknowledge the user request to cross.
  • The stop light: a strip of red LEDs embedded in the cycle track flash to stop approaching cycles.
  • The motion sensor: the LED strip contains a motion sensor to determine when it’s safe to cross. (This is an additional function compared to existing signal controlled crossings and is possibly overkill – the existing time delay before the next step is probably sufficient.)
  • The tactile knob and audible beep: The blister paving panel vibrates and beeps for as long as it takes to cross, after which the red LEDs stop flashing.

The proposed pressure sensitive, vibrating, beeping, blister paving panels (acronym required) on either side of the crossing would contain the control circuitry and be solar powered. This self contained design has the potential to keep the cost of installation to a minimum and the technology used already exists:

  • Solar City are manufacturing roof tiles with a process that would probably suit blister paving. Could a non-slip surface be incorporated too?
  • The force sensing and vibration is a scaled up version of Apple’s taptic engine. Would vibrating a whole human be too tall an order for it?
  • Motion sensing’s nothing new, assuming it can be tuned sufficiently to reliably sense approaching cyclists.
  • Embedded lighting has been used to stop motor vehicles at cycle crossings in the Netherlands.
  • In addition to the crossing functionality the blister paving panels could integrate beacons to aid navigation forming part of a network throughout towns and cities.

Could it work? At this year’s Disability Studies Conference one of the authors of the Guide Dogs report mentioned earlier, Bryan Matthews, presented a paper Where To Go Next? Technology and visually impaired people’s mobility in which he advised some caution in relying on technological solutions that require users to equip themselves with additional devices. Expense, complexity, reliability and sensory overload being some of the reasons that mean seemingly promising solutions may not work as well as first envisaged. What I’m proposing here, like my new knee, is a technological solution, but it doesn’t rely on the user having an additional device or on a third-party’s system. It’s essentially a reconstruction of an existing solution.

How might its feasibility be tested? PAMELA springs to mind. Back in April, Mobility for an Ageing Population included a tour of the Pedestrian Accessibility & Movement Environment Laboratory in Tufnell Park, which as well as being a research facility seemed to have people with all the skills needed to put something like this together. I can’t see the obvious flaw – yet – but there could be any number of reasons why it wouldn’t be successful in practice: counterintuitive; confusing; the vibrations spook guide dogs; the electronics drown in flash floods; not enough incident light to power it. Whatever the outcome though, I’m convinced a more inclusive solution than the ones currently available is required.

Architects and planners have been pursuing an uncluttered place-making aesthetic, loosely referred to as Shared Space, giving little apparent thought to, or making false assumptions about, how people with different constraints and capabilities will move through these places safely and efficiently. I’ve deliberately taken into account this emphasis on place-making with a visually unobtrusive design, while at the same time (I hope) maintaining a clear, formal method to interact with other modes (people on bikes, in cars, etc) for those pedestrians who need it in order to feel comfortable with using the space. In this case it’s a bus stop bypass, but the same could be applied to other contexts such as Exhibition Road or Frideswide Square.

Bearing in mind the cost of granite paving, surely it’s possible to design pleasant places to be without having to sacrifice anybody’s mobility and independence. Should anyone in the business get this far, consider that a gently tossed gauntlet.

 


  1. The prosthetic limb I used at the time was functionally the same as those in the 50s when the ‘Canadian’ design for hip disarticulation was first developed by Colin McLaurin. It was revolutionary because it employed a free hip joint and a free knee joint. Prior to that the hip joint, and often the knee joint, would be locked when walking and then released to move from a standing to a sitting position. The advantage is a more normal gait and a better stride length. The disadvantage is a greater risk of falling. It’s stability – my stability – depends on maintaining a small angle of about 5 to 10 degrees at the knee whenever the limb is weight bearing. The technical term is hyperextension – just beyond straight, the way knees don’t like to bend. Things that can affect that are not taking a full stride so the heel strikes the ground before the knee has reached the stable hyperextended position which can happen when trying to walk in a crowd or just shuffling weight from foot to foot when standing around at a checkout or a bus stop say. That can be bad enough on flat surfaces, but add some local surface variation and it introduces the possibility of the foot rocking on a bump and changing the knee angle. Slopes are also a problem, and because blister paving often forms part of a drop-kerb the combination of bumps and slope make it particularly troublesome. For above knee amputees it’s possible to manage stability at the knee joint by forcing the thigh backwards to maintain hyperextension, but with no thigh there’s a double whammy; not only can you not force the knee into a stable position, you can’t feel it moving into an unstable position in the first place. Small movements of the hip joint and the knee joint can’t be felt and because both are effectively free hinges it only takes a tiny force to make them rotate. The only indication that it’s happened is the subsequent fall. 

In the Margins of Error

InTheMarginsOfError

When you’re riding in the margins of error, is a maverick homicide detective your only hope when it all goes wrong?

Wednesday March 30th 2016…

“So what we got Sergeant?”

“Open and shut case Lieutenant. Our guy was riding along the bike path, heading into town, hit a patch of mud and BAM! Wipe out!”

Pats pockets, “You got a match Sergeant?”

“Sorry sir, crime scene boys don’t allow it anymore.”

“Is that a fact?” Hand to forehead, scans scene, “Have they found that missing pedal yet?”

“Turns out our guy’s an amputee sir; one foot, one pedal.”

“You’re kidding me!” Turns to gurney and lifts sheet. “Well I’ll be… What else do we know about him?”

“Local oddball sir, rides everywhere, up until today we estimate he’s made this journey into Oxford about a thousand times.”

“Do we have a time of death yet Sergeant?” Lights cigar and checks glow, “And were there any other players involved?”

“11.55am this morning sir. We got a couple of witnesses who say he was alone; one second he was on the bike, moving slow, the next he was on the ground.”

“You know, I just don’t get it. It’s a sunny day, our guy’s done this a thousand times before, no one else around, and he’s got all this path to use but he’s riding in the mud right by the edge. Not only that, but it looks like he was turning in a way to pretty much guarantee he came down on the side he couldn’t put a foot down on.”

Gesticulates, “I mean what happened here? Did he have a heart attack or something?” Heads for car, “I’ll be downtown. Let me know what the autopsy says.”

Raises hand, turns and shouts over traffic noise, “And one other thing Sergeant, how the hell are you meant to cross the road around here?”

Continue reading

Disabled cyclists in England: imagery in policy and design

Kevin Hickman (2015) Disabled cyclists in England: imagery in policy and design. Proceedings of the ICE – Urban Design and Planning. Published here (access-controlled). Pdf for personal non-commercial use here.

Things have moved on a little since I submitted the above titled abstract to the ICE journal Urban Design and Planning for a themed edition on disabilities, vulnerable road users and navigation of the urban environment. However, as this Design Manual being consulted on at the moment demonstrates, it remains relevant.

My thanks to the All Party Parliamentary Cycling Group, to British Cycling and to Sustrans for permission to use images from their documents; to Wheels for Wellbeing, Ann Wright, Caroline Waugh and Martin Symons for the pictures; and to Rachel Aldred for the initial advice and encouragement.

I hope the paper proves useful.

Foreign Fieldwork

Keep Right! Does Copenhagen’s success as a cycling city derive from the rigorous application of this simple rule?

That, until I missed the deadline for abstracts, was the title of my submission to this year’s Cycling and Society Symposium. So waste not want not, longer than an abstract but far from finalised, here’s where I currently am post-processing a three day study tour in and around Copenhagen.

I stayed in the fabled City of Cyclists for four nights in an apartment in a harbourside development in Christianshavn. Every morning I got up early and entered the flow of bike traffic circulating around the city’s central streets, copying what everyone else did, getting a feel for how it ‘works’ there, until it was time to follow my GPS back to that day’s meeting point and join the rest of the group. This train of thought is largely concerned with cycling on the busy stuff.

CPHSchoolRun

You quickly learn to keep right on a busy bike track as a newbie from a lefty-land, and that’s where you’ll find the kindergarten kids cycling to school on their own bikes, with either a parent giving a helping hand alongside or shadowing directly behind. Once you’re amongst the crowd on the correct side of the street, ‘keep right!’ isn’t something you need to give any conscious thought to – you have the visual indicators of the pavement on one side and the road on the other. Pavement slow and objectively safe, road fast and subjectively scary, and within the bike track itself an effective gradient of increasing speed running out from the pavement towards the road. I don’t think the kids or I were putting any mental effort into trying to remember our right from our left – we were just instinctively staying out of the way by keeping to the edge. Continue reading

Connecting the Dots

EthanolFour years into Oxfordshire’s latest transport strategy and here we are embarking on another multi-stage consultation for Local Transport Plan 4. The official reasoning makes a case for it but can the goals and objectives of a strategy covering two decades really have changed so much that it warrants starting from scratch? We’ll be taking a look at the detail following tomorrow’s Connecting Oxfordshire meeting at 7pm in Henry Box School.

Connecting Oxfordshire conjures up the idea of places joined together, settlement to settlement, Carterton to Witney, Witney to Oxford, but that’s only one level of local transport. The hyperlocal is at least as important – how we move around within settlements – and it’s the one we consistently fail to make more efficient, pleasant and healthy. Travelling along better local transport links is one part of the solution, not having to sit in 15 minutes of congestion at either end is the other.

The only major road project during four years of LTP3 to be planned, signed-off and (soon to be) built in Witney is the Ducklington Lane junction improvement. It started out with a £2 million budget and a brief to future proof it for a predicted 2030 level of motorised traffic. When the engineering contractor Atkins ran the junction through its capacity modelling software ‘computer said no’; it didn’t have enough lanes for stacking. That’s a technical term for temporarily parking vehicles at a junction so a queue doesn’t back up so far that it adversely effects the next junction upstream.

DucklingtonLaneJunctionWestApx5

(Edited to update diagram to Option 4 in Annex 5)

What to do? Quite a large area around the junction is deemed highway land and during a site visit Atkins’ engineer noticed the B&Q corner “doesn’t go anywhere” (the business park being hidden behind a very large hedge) so no crossings or pavement to it would be required. That was a boon to a modeller of motor traffic because it meant:

  • the pavement removal would give more space for traffic lanes,
  • more time could be retained for traffic movements.

Stacking traffic is only part of the equation for a signalised junction, there also needs to be a enough time available to clear the stack during each light sequence so a growing remainder doesn’t back up over time. Adding a proper Toucan crossing to reach B&Q would scupper the junction’s maximum capacity in the traffic model.

BikesAtBandQPathToBandQ

Despite bikes being regularly parked at B&Q, and people beating paths through the bushes to it, the traffic counts showed low numbers of people walking and cycling on the western arm of the junction, supporting the removal of the pavement along with the potential to cross there. If you’ve tried it you’ll know why; it’s relatively risky and far from pleasant. It’s so unpleasant and off-putting in fact, a sympathetic observer might conclude that the people counts ought to be multiplied by a factor of about 100 to take that into account. Traffic models can’t empathise neither can they model people walking or cycling.

During the consultation bike users requested better access which resulted in a 2m shared path along Thorney Leys to an informal pedestrian crossing, with a refuge, to Thorney Leys Business Park. Oxfordshire County Council could not provide an official, safe and convenient bike route for the employees and visitors to B&Q and the rest of the businesses there. ‘Encouraging’ people to cycle and relieve congestion doesn’t yet stretch to giving them a place to do it.

I don’t think we’ll get another chance to put that right for a very long time and this corner of Witney will continue to be cut off from the bike network for now, and will remain so when the junction eventually starts to operate at its designed capacity in the late 2020s. All that tarmac poured, rolled and marked out, sat there through rain and shine, developing potholes, waiting for that day. Does that sound innovative to you?

So perhaps Ian Hudspeth, the architect of Connecting Oxfordshire, is right, the Local Transport Plan does need a revamp from the top down. I’m not so sure. Cycling and walking were high priorities for all settlement types in LTP3, including Witney, but that had no influence when it came to providing people with a safe and convenient option to cycle to Thorney Leys Business Park. Not considering walking and cycling until after the road layout for the junction was complete was a failure to plan for walking and cycling; good policy made no difference to an old process.

Come along tomorrow and ask Ian how he’s going to fix that for short journeys at the hyperlocal level, as well as for the local transport links to and from Witney.

The Dimensioned Cyclist

TheDimensionedCyclingTwinsThere’s a lot to read, research and review right now in the world of new, cycle-friendly infrastructure design, but you’ll find at least one familiar character doggedly plodding his way through from one version to the next – the dimensioned cyclist.

I don’t know when he first appeared, perhaps there’s a bike-infra historian out there who does? I got into this campaigning game in about 2008 and at that time he could be found wobbling around in a 1m envelope with his twin brother in figure 2.2 of the DfT’s LTN2/08: Cycle Infrastructure Design.

The last four years of austerity have clearly had an effect in London because he’s had to move with the times and confine his elbows to 75cm, his space budget slashed in figure 3.2 of the Draft London Cycling Design Standards by a whopping 25% (along with the graphics budget).

DimensionedCyclist

Meanwhile, Sustrans, always aware of gender balance in its publications, has chosen to illustrate the width required by cyclists in its new design handbook with his sisters. Progress indeed.

TheDimensionedFemaleCyclistNow, if I were to spend an afternoon flicking through the Design Manual for Roads and Bridges, God forbid, how likely is it I’d come across a whole section devoted to the dimensions of one of the most common cars on the roads today like the Ford Fiesta? Along with a footnote about larger, less common, but more problematic vehicle types to design for such as vans and lorries? The motoring equivalent of this…

2.6.1 Highway designers consider the dimensions of motor vehicles and their swept paths to determine carriageway widths, junction dimensions and parking layouts. The sizes and swept paths of cycles are usually irrelevant in the design of on­road cycle routes, but there are occasions where they need to be considered. Examples include the approach to a cycle gap, or the interface between the carriageway and an off­road cycle route. Failure to provide the room a cyclist requires can make some routes inaccessible or difficult to use, particularly for disabled cyclists, tandem or trailer users and parents transporting young children by bicycle.

For comic effect I’m being a tad unfair to Local Transport Note 2/08 because it does mention the dimensions of a couple of other bike types, but my point is you won’t find a dimensioned drawing of any other bike type. Neither does it make them easy to picture or design for.

Why are cycle infrastructure design gurus obsessed with diagrams of one type of bike? Is it because other bike types are too difficult to draw? Does showing a handcyclist in primary position feel too uncomfortable? Are bike cargo companies just a fad and not worth consideration in future cycle networks? I’d really like to know because along with other inclusive bike users it’s making my cycling life bloody miserable and turning me into a very grumpy bike-bore at parties.

But hold on a second, section 2.6.1 appears to hold the answer to the problem of designing properly for different bike types – swept path analysis. As far as I know, despite it being a commonly used tool available to highway engineers and urban designers in their chosen CAD systems, nobody applies it to model the larger inclusive bike types in cycle infrastructure design. Just think of all that computing power and graphical game playing fun going to waste!

So bike-infra bods, how about we put a stop to this perverse practice of dimensioning the stereotypical cyclist and set about properly integrating inclusive bike types into the design workflow? Embrace equality and build an accessible environment for everyone – you know you want to 🙂